Detailed engineering of 3 barriers in Lerini stream, branch of Drini river, Shkoder district
Project consists in detailed design of the 3 barriers on Lerini stream, branch of Drini river in order to prevent deposits in the reservoir of the Koman HPP located in Shkodra.
The Lerini Stream has a 100 years return period flow of 211 m³/s and it discharges in the reservoir of the Koman HPP.
The structures handled technically by ICE are three gabion barriers with maximum height up to 13 m and maximum length up to 65 m.
The main services provided within this Project were as those below:
• Surveying works
• Hydrological study
• Geotechnical investigation and report
• Hydraulic and structural design of barriers
• Estimation of Bills of Quantity
• Preparation of technical specifications
Case Details
Sectors : Water Resources
Client : KESH sh.a.
Start Date : 03/2013
End Date : 06/2013