Design review of reconstruction project of the roads: Mutsamudu-Sima, Sima-Bongoueni and Sima-Bimbini in Anjouan Island
The purpose of this project is the review of the existing design that has been done for the reconstruction of the Mutsamudu-Sima Road and its Braces Sima-Boungweni and Sima-Bimbini in Anjouan, Union of Comoros. The total length of the project is 27.3 km. The Consultant will verify dall the design documents including the topographical survey, design drawings, geology, hydrology, temperature data and other climatic features, ecologically sensitive features, sources of locally available construction materials, traffic data, maps, statistics, socioeconomic conditions etc. If there are missing data or items, the consultant will make reasonable assumptions regarding to the related risks associated to the lack of that kind of data.
At the end a detailed report containing the main findings, missing data, suggestions and a risk analysis table of the existing design will be submitted to the Client.
Case Details
Sectors : Transportation
Client : Alteraz, KSA
Start Date : 12/2019
End Date : 02/2020
Let’s Work Together!
Call us now or send us an email.
Our Address
Rr. Sami Frashëri, Nd. Bjorn, K. 11, Tirana, Albania, 1019