Detailed engineering of 3 barriers in Lerini stream, branch of Drini river, Shkoder district

Project consists in detailed design of the 3 barriers on Lerini stream, branch of Drini river in order to prevent deposits in the reservoir of the Koman HPP located in Shkodra. The Lerini Stream has a 100 years return period flow of 211 m³/s and it discharges in the reservoir of the Koman HPP. The structures handled technically by ICE are three gabion barriers with maximum height up to 13 m and maximum length up to 65 m. The main services provided within this Project were as those below: • Surveying works • Hydrological study • Geotechnical investigation and report • Hydraulic and structural design of barriers • Estimation of Bills of Quantity • Preparation of technical specifications

Case Details

Sectors : Water Resources

Client : KESH sh.a.

Start Date : 03/2013

End Date : 06/2013

Let’s Work Together!

Call us now or send us an email.

Our Address

Rr. Sami Frashëri, Nd. Bjorn, K. 11, Tirana, Albania, 1019

Phone Number

+355 69 709 9689

Email

info@ice.al